HONGYANG GROUP tokelau Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP tokelau Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

P-GA FUEL DISPENSER

P-GA

P-GA FUEL DISPENSER

Pump Type: Optional

Inlet Pressure :>=54kPa.

Flow rate (L/min.) :55±5

Suction Distance (m) :6(verticalmente) / 50(orizzontalmente)

FlowMeter Type : Optional

Accuracy :±0.2%

Motor Voltage(V) :110V/220V/380V,50Hz/60Hz

Capacity(hp) :1HP(0.75kw)

Input Voltage : 110V/220V/380V,50Hz/60Hz

Nozzle :Auto Shut-off Nozzle

Environmental Condition : -40~~+55degree

Control Type: Solenold Vale Control Type

Preset :Function Provided(Small LCDIndicator)

Display(Counter) :Type LCD and Bright Backlight

Digit of Volume : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount :0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price :0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Optional Display :Type LCD and Bright Backlight

Digit of Volume : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price :0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Totalizer: 1~~9,999,999

Hose :4.5m

Weight : 280kg

Dimension(L×W×H): 1060*550*1620(mm)

Dimension(L×W×H)Of Qty of Container : 40ft: 44 20ft: 22

products links

links

technical archives

    As past over long service time, parts abrasion universally or cylinder severely damaged, a new measurement transducer should be installed to replace old one. As find exterior leakage, firstly inspect the bolts corresponding to leak section. Tightly screw loose bolts, if leakage is continued, disconnect and inspect the seal ring and gasket relative section. Substitute aging or damaged parts and reassemble. Apart from the above reasons of extensive colloid and surface abrasion, these trouble also cause abnormal operation of measurement transducer, such as position pin fall down from piston or deformation, small axis lost on upper and lower connecting rod, loose bolt between piston and connecting rod. The solution is that disassembling measurement transducer, replace damaged or unqualified components and reassemble. The products made in normal factory seldom appear these troubles. Since measurement transducer is core component of fuel dispenser, elaborate machining, disconnection and reassembly should be as careful as possible. All elements should be cleaned before reassembly, excluding water into inner. Bolts are tightened even and appropriately. Soft-piston measurement transducer As these merits --- small in size, light weight, beautiful appearance, high accuracy, piston exchangeable--- soft-piston measurement transducer is widely adapted in domestic fuel dispenser market. It generally involves two structures: four-piston structure and double-piston structure. The latter model is selected universally. fuel dispenser Therefore, this article will introduce the structure, working principal and maintenance of four- piston measurement transducer. Structure Diagram 2-20 and Diagram 2-21 show the cutaway view and exploded drawing of four-piston measurement transducer that is widely employed. The transducer mainly consists of sealed cover, upper subassembly, export axis, frame subassembly, piston subassembly, connecting rod and top cover, clearly presenting in Diagram 2-20 and Diagram 2-21. Diagram 2-20: Cutaway view fuel dispenser fuel dispenser

technical specification

    tions usually  accredited provide certification or registration of conformity with requirements such as those of ISO 9001.  ISO 19011 provides guidance on auditing.  2.8.3 Reviewing the quality management system  One role of top management is to carry out regular systematic evaluations of the suitability adequacy  effectiveness and efficiency of the quality management system with respect to the quality policy and quality  objectives. This review can include consideration of the need to adapt the quality policy and objectives in  response to changing needs and expectations of interested parties. The review includes determination of the  need for actions.  Amongst other sources of information audit reports are used for review of the quality management system.  2.8.4 Self-assessment  An organizations self-assessment is a comprehensive and systematic review of the organizations activities  and results referenced against the quality management system or a model of excellence.  Self-assessment can provide an overall view of the performance of the organization and the degree of maturity  of the quality management system. It can also help to identify areas requiring improvement in the organization  and to determine priorities.  2.9 Continual improvement  The aim of continual improvement of a quality management system is to increase the probability of enhancing  the satisfaction of customers and other interested parties. Actions for improvement include the following:  a) analysin fuel dispenser g and evaluating the existing situation to identify areas for improvement;  b) establishing the objectives for improvement;  c) searching for possible solutions to achieve the objectives;  d) evaluating these solutions and making a selection;  e) implementing the selected solution;  f) measuring verifying analysing and evaluating results of the implementation to determine that the   objectives have been met;  g) formalizing changes.? fuel dispenser fuel dispenser

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    shot through Bermuda last month she cut power, blew out windows and was blamed for the deaths of two flamingos at the local zoo (killed by falling branches). Just as she was bearing down, though, most of the people who make Bermuda a global hub for insuring against natural catastrophes were at an industry conference in sunny Monte Carlo. In contrast to the deadly (and costly) hurricanes of 2005, Florence was a wisp of a storm. That has been the pattern all season. Despite warnings from weather forecasters early this year that more ferocious storms were likely, the hurricane season—which will end in a few weeks—has so far been docile. This is good news not just for homeowners and businesses spared devastation; investors who have poured money into a growing market for catastrophe risk are set to make a fortune. Increasingly, these include hedge funds. Part of the expected windfall in 2006 stems from the wrathful weather last year. Hurricanes account for the vast majority of insurance catastrophes; the insured loss from Katrina last year ($45 billion) was more than twice that from the terrorist attacks of September 11th 2001 ($21 billion). The losses suffered by insurers last year caused a big rethink of the catastrophe market, and many reduced coverage. Normally, new sources of capital tend to flock in after disaster strikes, replacing some of what is paid out or withdrawn by hard-hit insurers who scale back on the business. Barney Schauble, of Nephila Capital, a Bermuda hedge fund, estimate fuel dispenser s that insurers pulled out more than $100 billion of capital last year, while $20 billion to $30 billion of new money flowed in. “Net, there was quite a large hole,�he says. With tougher capital requirements on catastrophe reinsurers from rating agencies, that led to big premium increases in America when contracts were renewed in January and July (they were flatter in Europe and Asia). Hedge funds sniffed an opportunity and moved in. “There was a shortage of capital and they supplied the ca fuel dispenser fuel dispenser