S-G2 FUEL DISPENSER

S-G2

S-G2 FUEL DISPENSER

Pump Type:Optional

Inlet Pressure :>=54kPa.

Flow rate (L/min.): 55±5

Suction Distance (m) :6(verticalmente) / 50(orizzontalmente)

FlowMeter Type : Optional

Accuracy : ±0.2%

Motor Voltage(V) :110V/220V/380V,50Hz/60Hz

Capacity(hp) :1HP(0.75kw)

Input Voltage : 110V/220V/380V,50Hz/60Hz

Nozzle :Auto Shut-off Nozzle

Environmental Condition :-40~~+55degree

Control Type : Solenold Vale Control Type

Preset :Function Provided(Small LCDIndicator)

Display(Counter):Type LCD and Bright Backlight

Digit of Volume : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount :0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price : 0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Optional Display :Type LCD and Bright Backlight

Digit of Volume : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price :0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Totalizer :1~~9,999,999

Hose :4.5m

Weight : 247kg.

Dimension(L×W×H): 1160*560*2215(mm)

Dimension(L×W×H)Of Qty of Container : 40ft: 27

products links

links

technical archives

    keep good earthing and sealability and conduct pressure –resistance fuel dispenser test as regulation in national standard GB50156-2002. Don’t input oil or burry tank before pressure testing. Diagram 5-4: Correct installation of fuel dispenser and tank The inlet pipe of tank should be mounted bottom valve, which is vertical and 100mm higher than tank bottom. As crucial to fuel dispenser’s normal operation, bottom valve should have good sealability and performance. It is prohibited to connect fuel dispenser with semi-underground tank, above ground tank and high position tank. If oil level is higher than vapor separator exhaust pipe would overflow leading to insecurity working circumstance. Given have to adapt one of above tank, the exhaust pipe of vapor separator should be sealed in case oil overflow out. Match of fuel dispensers and tank: if adopt one tank delivering oil to two or more fuel dispensers each fuel dispenser should have single pipe without interconnection. Diagram 7-4 shows the right connection. Diagram 5-5 is wrong one. Diagram 5-5: Inappropriate installation of fuel dispenser and tank If one fuel dispenser is connected to two or more tanks valve is necessary to be installed in pipeline. Diagram 5-6 illustrates this kind of connection. In short, the connection of fuel dispensers and tanks, whatever working circumstance, should comply with the basic principle that one tank, one valve and one pipe are connected with one fuel dispenser. Otherwise, the normal measuring function of fuel dispenser would be affected. Diagram 5-6: Combination of two or more tanks Electric Installation The general power switch is installed indoors, switch fuse is defined as the current of motor when starting. The earthing line of fuel dispenser should firstly connect with ground device of filling station before e fuel dispenser lectric installation. Power wire of fuel dispenser should connect into TN-S power supply system, compatible to TN-C-S and TN-C systems. Lead and wire should be five-bind copper thread with two protective fuel dispenser

technical specification

    xy to activate a certain peripheral for an   inputoutput.  3. T fuel dispenser he application does not receive any response from the device proxy  4. The application reacts accordingly.  Scenario - (4) - Unsuccessful inputoutput for application failure  1. The application (Sell or EPS) requires a certain action on a peripheral.  2. The application requires the device proxy to activate a certain peripheral for an   inputoutput.  7. The cashier or the customer performs the required action on the peripheral.  8. The device proxy gets from peripheral the response.  9. The device proxy fails to tell the application the unsuccesful result of the request   because of no acknowledge.  10. The device proxy reacts accordingly.  August 2002 IFSF STANDARD FORECOURT PROTOCOL FP319_1.00   EPS POS INTERFACE SPECIFICATION   Page 49 of 146  5. PART A - XML IMPLEMENTATION  The following XML schema summarises the interface message structure between the POS Sell Application  and the EPS application. Next some examples clarify the application of the schema.  It is important to remember the actual role of the EPS application that explains why the feedback to the Sell  application is the minimum. The schema includes possible influence from the paymentloyalty environment  on amountprices.  The use cases and the examples facilitate the comprehension. The examples are designed as generic with  no actual data example.  5.1 XML schema - EPSPOS: CardServiceRequest  See Appendix for the proper XSD schema specification. Below is summarised the logic of the data and some  examples in the following paragraphs.   fuel dispenser element   POS request for service to EPS; the possible requests are identified by the required attribute   RequestType: fuel dispenser

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    minded cross-party replacement. Instead he got a hardline economic n fuel dispenser ationalist. The party chief makes frequent, vehement interventions in both parliament and the media. He has denounced the head of the central bank, Leszek Balcerowicz, demanding an investigation into his record, and is setting up a powerful new body to oversee the banking system. That has shocked those who see Mr Balcerowicz as a heroic figure in the country s recent economic history. As finance minister in the early 1990s, he pioneered the monetary stringency and free prices that, his fans say, kick-started Polish capitalism. The central bank is a bastion of economic orthodoxy and has run a tight monetary policy to make up for what it sees as the spendthrift habits of the politicians. The media have also incurred Jaroslaw Kaczynski s displeasure. “There are no free media in Poland,?he controversially declared earlier this year. He wanted a special commission to examine links between journalists and the security services. His main target is what he calls the “lying elite?or the “establishment”—a mixture of shady businesspeople, semi-retired spies and their hangers-on in the media. Weird and wonderful His commitment to Poland s membership of the European Union has sometimes been questioned, and the new government s handling of foreign affairs has looked inept. Law and Justice, and particularly the Kaczynski brothers, hold ardently pro-American views, matched by loathing of both Russia and Germany. This goes back quite a while. In the early 1990s, after a lengthy lecture by Jaroslaw Kaczynski on German wickedness, an exasperated Helmut Kohl, then Germany s chancellor, ordered him out of his office in Bonn and told an aide “Don t let that man within gunshot of this building again.?Mr Kaczynski says he was fuel dispenser surprised at his treatment he had just been “speaking plainly? Things do not seem to have changed much, judging by a recent interview given by Lech Kaczynski to one of France s best- fuel dispenser